Parking Cost
Estimator
Get an indicative ₹ cost range for your parking — car bays, bike bays and EV charging — across basement, stilt, structure and surface parking.

Parking Cost Estimator
Enter your bay counts — get an indicative budget range in seconds.
Project Details
Please enter a valid number of car bays.
Select a structure type and enter your bay counts above.
* Indicative construction cost only — excludes land, consultancy, automation and local taxes. Costs vary by city, soil and specification.
Cost Benchmarks at a Glance
Indicative Indian per-bay costs — always validate with a site-specific estimate.
| Item | Indicative Range | Notes |
|---|---|---|
| Basement / In-ground bay | ₹3 – 6 lakh / bay | excavation, waterproofing, MEP |
| Stilt bay | ₹1.5 – 3 lakh / bay | column framing + slab |
| Above-ground structure bay | ₹2 – 4 lakh / bay | RCC frame, ramps, finishes |
| Surface / Ground bay | ₹0.8 – 1.5 lakh / bay | paving, markings, drainage |
| Bike bay | ₹0.3 – 0.6 lakh / bay | as part of the car deck |
| EV slow AC point | ₹0.5 – 1 lakh / point | 7–22 kW, cable + installation |
| EV fast DC point | ₹5 – 15 lakh / point | 30–150 kW + panel upgrades |
| Included | Excluded |
|---|---|
| Civil works & excavation | Land & acquisition cost |
| Waterproofing & drainage | Consultancy & design fees |
| Basic MEP (lighting, ventilation) | Automation (ANPR, guidance) |
| Finishes, markings & signage basics | Wayfinding & smart systems |
| Ramp & structure works | Local taxes & price escalations |
Cost Estimator — FAQ
How the estimate works and when you need a precise figure.
Why is the range so wide?
City, soil conditions, water table, level depth and material prices move parking costs a lot. The ranges cover typical Indian projects — a site-specific study narrows them to a reliable budget figure.
Does this include automation or EV?
No. ANPR entry, guidance systems, signage and EV charging are separate line items. Add EV points in the tool to see their cost.
Are stilt bays really that much cheaper?
Yes — no excavation or waterproofing. But stilt uses valuable ground-floor area, so the real trade-off is land value and usable frontage.
How do I get a precise estimate?
Share your site details and a draft layout with us. Our cost engineering is delivered as part of the feasibility report.
