Get an indicative ₹ cost range for your parking — car bays, bike bays and EV charging — across basement, stilt, structure and surface parking.
Enter your bay counts — get an indicative budget range in seconds.
Please enter a valid number of car bays.
Select a structure type and enter your bay counts above.
* Indicative construction cost only — excludes land, consultancy, automation and local taxes. Costs vary by city, soil and specification.
Indicative Indian per-bay costs — always validate with a site-specific estimate.
| Item | Indicative Range | Notes |
|---|---|---|
| Basement / In-ground bay | ₹3 – 6 lakh / bay | excavation, waterproofing, MEP |
| Stilt bay | ₹1.5 – 3 lakh / bay | column framing + slab |
| Above-ground structure bay | ₹2 – 4 lakh / bay | RCC frame, ramps, finishes |
| Surface / Ground bay | ₹0.8 – 1.5 lakh / bay | paving, markings, drainage |
| Bike bay | ₹0.3 – 0.6 lakh / bay | as part of the car deck |
| EV slow AC point | ₹0.5 – 1 lakh / point | 7–22 kW, cable + installation |
| EV fast DC point | ₹5 – 15 lakh / point | 30–150 kW + panel upgrades |
| Included | Excluded |
|---|---|
| Civil works & excavation | Land & acquisition cost |
| Waterproofing & drainage | Consultancy & design fees |
| Basic MEP (lighting, ventilation) | Automation (ANPR, guidance) |
| Finishes, markings & signage basics | Wayfinding & smart systems |
| Ramp & structure works | Local taxes & price escalations |
How the estimate works and when you need a precise figure.
City, soil conditions, water table, level depth and material prices move parking costs a lot. The ranges cover typical Indian projects — a site-specific study narrows them to a reliable budget figure.
No. ANPR entry, guidance systems, signage and EV charging are separate line items. Add EV points in the tool to see their cost — automation is best estimated after the layout is finalised.
Yes — no excavation or waterproofing. But stilt uses valuable ground-floor area, so the real trade-off is land value and usable frontage, not just construction cost. Basements usually win for large projects.
Share your site details and a draft layout with us. Our cost engineering is delivered as part of the feasibility report — covering civil, MEP, automation and phasing.